File Number Site Name Permittee/Applicant Revision Subject Detailed Description Permitting Action Type Permitting Sequence Date
Submitted
Date Filed
(Complete)
Application Comments
Due Date
Decision Due Date Decision Extension Division
Decision
Decision Comments
Due Date
Division
Specialist
M1976038 Meeker Pit Meeker Sand & Gravel, Inc. Updated Mine MapNULL Updated mine map which includes permit boundary, to depict released areas (AR-1) and curent site conditions. Preperation for future release. NULL TR 4 1/4/2023 1/10/2023 NULL 2/9/2023 6/1/2023 NULL
M1999038 Rowe Gravel Rowe Gravel Temporary Cessation NoticeNULL NULL TC 2 10/12/2022 NULL NULL NULL NULL NULL
M1977305 C-LP-21 Mine Highbury Resources Inc. End TC to Reclamation StatusNULL NULL CS 1 2/3/2020 6/23/2021 NULL NULL NULL NULL
C1996084 Lorencito Canyon Mine New Elk Coal Company, LLC 2020 Midterm ReviewNULL NULL MT 5 5/5/2020 5/5/2020 NULL NULL NULL NULL
M1996013 Hasty Pit Carder, Inc. NULL NULL CS 2 1/28/2020 NULL NULL NULL NULL NULL
M2008009 Lyster Pit Oldcastle SW Group, Inc. dba United Companies Acrage reduction request of 37.1 acres.NULL Acrage reduction request of 37.1 acres.NULL AR 1 7/27/2020 8/5/2020 NULL 10/5/2020 NULL NULL
M2009079 Peroulis Brothers Snake River Pit Precision Excavating, Inc. Request for Surety ReductionNULL Precision Excavating, Inc proposes a surety reduction for the Peroulis Brothers Snake River Pit to reduce the bond for the site to the amount required to complete the seeding of vegetation.NULL SR 1 10/27/2020 11/6/2020 NULL 1/5/2021 NULL NULL
M2009079 Peroulis Brothers Snake River Pit Precision Excavating, Inc. Precision Excavating, Inc. is requesting a full and final release of 101 acres.NULL Precision Excavating, Inc. is requesting a full release of 101 acres at the Peroulis Brothers Snake River Pit. This request is for the full and final release of the entire permit area.NULL SL 1 10/22/2021 11/2/2021 NULL 1/3/2022 NULL NULL
M1979142 West of Maybell Pit Colorado Department of Transportation NULL NULL SL 1 8/24/2021 NULL NULL NULL NULL NULL
C1981018 Deserado Mine Blue Mountain Energy, Inc Midterm Review No. 8 dated 12/21/2022.NULL NULL MT 8 12/21/2022 NULL NULL NULL NULL NULL
C1981012 New Elk Mine New Elk Coal Company, LLC Permit Revision 6NULL New Elk Coal Company, LLC is proposing to expand the permit area of the New Elk Mine and is proposing to expand their underground mining operation in the Blue Coal Seam.NULL PR 6 9/27/2022 10/14/2022 NULL 2/11/2023 NULL NULL
M1977439 Home Office Mine Martin Marietta Materials, Inc. Update mining and reclamation plans and maps to reflect existing and proposed conditions, including modifying Stage G from open water pond to lined water storage.NULL Update mining and reclamation plans and maps to reflect existing and proposed conditions, including modifying Stage G from open water pond to lined water storage. No new acreage is being added to the permit.NULL AM 4 12/23/2021 1/10/2022 NULL 4/11/2022 2/27/2023 NULL
M1977342 Henderson Mine Climax Molybdenum Company CDPHE Complaint forwarded to DRMS NULL Caller reported to CDPHE observing white crystalline material blowing onto the tailings pond and the river,NULL CT 1 5/26/2022 5/26/2022 NULL NULL NULL NULL
M2010012 Mooney 5804 Altura Pit All-Rite Paving & Redi-Mix, Inc. Amendment 1NULL NULL AM 1 1/25/2023 NULL NULL NULL NULL NULL
M2008001 Blue Grass Gravel Pit Southwest Farms, Inc. Succession of Operator - M2008001 - Blue Grass PitNULL This is an application for succession of operator for permit M2008-001, Blue Grass Gravel PitNULL SO 5 12/21/2022 1/23/2023 NULL 3/24/2023 NULL NULL
M2003002 Ghost River Gravel Pit HCR High Country Repair ConversionNULL NULL CN 1 2/3/2023 NULL NULL NULL NULL NULL
M1991080 Van Egmond Stone Pit Russell Van Egmond NULL 110c to 112c Conversion Application CN1: Addition of 10 acres to the permit for a total of 20 acres.NULL CN 1 3/23/2022 12/29/2022 NULL 3/29/2023 NULL NULL
M1986015 Pueblo East Pit Colorado Water Protective and Development Association Citizen ComplaintNULL I currently live at 275 28th lane in Pueblo and there have been substantial issues regarding wells, cisterns and lack of water for those of us living here. A couple of years ago Transit Mix of Pueblo along Highway 50 had informed my mom that their land dredging had altered the water table, rending our well unable to pump water. They installed a cistern system and have been providing water hauling free of charge since then as a result of this, and an agreement that my mom the property owner signed with them. Since Transit Mix has traded hands to Castle Aggregate, Jerry Schnabel has become our point of contact with issues regarding the cistern system. He is ignorant, rude, and negligent towards our family and the farm I run here. Today we have been 7 days without running water, this is one of several times within the past couple of years this happened because he does not view the contract he inherited or our lack of running water to be of his concern. I'm sending this email in a desperate effort to explore any options there could be to permanently remedying the situation, and preferably not have to deal with Jerry any longer. Thanks, Tyler Chee tdchee@gmail.comNULL CT 2 2/6/2023 NULL NULL NULL NULL NULL
C1996084 Lorencito Canyon Mine New Elk Coal Company, LLC Permit Renewal No, 5NULL This application is to renew the Lorencito Canyon Mine permit, which expires November 7, 2022.NULL RN 5 4/27/2022 4/29/2022 NULL 8/27/2022 2/17/2023 NULL
M1977572 Lamar East Pit City of Lamar Full/Final ReleaseNULL NULL SL 2 2/6/2023 NULL NULL NULL NULL NULL
M2021052 Rifle Gravel Pit #1 IHC Scott, Inc. Amendment #1 requests to change the mining method.NULL IHC Scott, Inc. has applied for an Ammendment to the Rifle Gravel Pit #1 to revise the mining method at the site to be changed to wet mining methodology.NULL AM 1 4/20/2022 4/29/2022 NULL 7/28/2022 3/17/2023 NULL
M1980244 Cresson Project Cripple Creek & Victor Gold Mining Company Closure stormwater design updatesNULL Newmont Corporation’s Cripple Creek and Victor Gold Mining Company (CC&V) hereby provides Technical Revision (TR) 131 documenting updated closure stormwater designs; as committed to during the second and third adequacy reviews of the CC&V Amendment 13 (AM-13).NULL TR 131 3/24/2022 3/24/2022 NULL 4/25/2022 3/1/2023 NULL
M1980244 Cresson Project Cripple Creek & Victor Gold Mining Company ECOSA Monitoring Plan UpdateNULL Update to the Cripple Creek & Victor surface water monitoring plan and monthly grassy valley reporting.NULL TR 132 10/27/2022 10/27/2022 NULL 11/28/2022 2/28/2023 NULL
M1980244 Cresson Project Cripple Creek & Victor Gold Mining Company WHEX Clay Borrow SourceNULL Proposing to mine a clay borrow source on the northern perimeter of the WHEX pit.NULL TR 133 2/2/2023 NULL NULL NULL NULL NULL
M1983194 Nahcolite Project Natural Soda LLC Drilling and completion of production wells 18H-1V and 18H-IR-W on new/extended pads, additional roads and pipeline disturbancesNULL Drilling and completion of production wells 18H-1V and 18H-IR-W on new/extended pads, additional roads and pipeline disturbancesNULL TR 50 2/1/2023 2/1/2023 NULL 3/3/2023 NULL NULL
M1995057 Rudibaugh Pit Deb Rudibaugh Forfeit FW MV-2021-002NULL NULL CS 3 10/20/2021 10/22/2021 NULL NULL NULL NULL
M1983159 Gleason Pit S & S Aggregate, Inc Temporary CessationNULL NULL TC 2 10/5/2022 10/7/2022 NULL 11/7/2022 NULL NULL
M1984014 C-JD-8 Highbury Resources Inc. NULL NULL TC 3 4/1/2019 NULL NULL NULL NULL NULL
M2017014 Cottonwood Pass Pit Oldcastle SW Group, Inc. dba United Companies NULL NULL SL 1 6/27/2022 6/27/2022 NULL 8/26/2022 NULL NULL
C1992081 Hayden Gulch Loadout Hayden Gulch Terminal, LLC Permit Renewal No 6NULL Permit Renewal No. 6 proposes to renew the Hayden Gulch Loadout permit for another five year term.NULL RN 6 11/18/2022 11/28/2022 12/31/2022 3/28/2023 NULL NULL
C1981008 New Horizon Mine Elk Ridge Mining and Reclamation, LLC permit renewal applicationNULL Elk Ridge Mining and Reclaimation has submitted a permit renewal application.NULL RN 8 11/22/2022 11/22/2022 NULL 3/22/2023 NULL NULL
M2017025 Cottonwood Pass Pit Oldcastle Southwest Group, Inc. dba United Companies NULL NULL SL 1 6/27/2022 6/27/2022 NULL 8/26/2022 NULL NULL
M2003002 Ghost River Gravel Pit HCR High Country Repair Surety incrrease to cover the cost of reclamation at the site.NULL NULL SI 2 8/26/2021 8/26/2021 NULL 10/25/2021 1/15/2022 NULL
M2021058 Arkansas Valley Slag (AVS) CJK Milling Company, LLC Request for Technical RevisionNULL NULL TR 1 4/11/2022 NULL NULL NULL NULL NULL
M2008083 Black Cloud Mine Resurrection Mining Company Complaint from Brian Werderman - downstream property owner: Blown out beaver dams, sedimentationNULL NULL CT 1 7/8/2019 NULL NULL NULL NULL NULL
M1977208 Lyons Quarry CEMEX, Inc. Citizen ComplaintNULL Wylie Hobbs, wylie@wyliehobbs.com. 11683 Pointe View Dr. Longmont CO 80503. (617)-447-4374. The CEMEX Lyons facility located at 5134 Ute Hwy, Longmont, CO 80503 consistently omits large amounts of dust (potentially toxic CKD) which blows to the surrounding areas. I have personally documented well over a dozen very large events in the past year by happenstance, who knows how much worse it actually is as there is no 24/7 surveillance. This is an extremely egregious public health violation and CEMEX needs to be held accountable for their negligence. Beginning in December of last year, I began documenting on the SOSVV website here: https://www.sosvv.org/cemex-fugitive-dust-eventsNULL CT 4 1/11/2023 NULL NULL NULL NULL NULL
M1977208 Lyons Quarry CEMEX, Inc. Citizen ComplaintNULL Sarah Lorang, 12800 Foothills Hwy, Longmont CO 80503, lorang.sarah@gmail.com, 303-476-0089 I am writing regarding the Lyons Quarry Permit M1977208. The current Reclamation Plan for Cemex Lyons includes a surety bond of approximately $8.9MM, which is based on estimates from nearly 20 years ago. DRMS has previously indicated that this bond amount is likely inadequate in present day dollars and needs to be reassessed. Semi-related, the Reclamation Plan also now calls for the burial of concrete rubble and the onsite disposal of various materials, which is a significant modification to the Reclamation Plan and was approved via a Technical Revision in the 2001/2002 timeframe without an Amendment and the corresponding public notice process. In light of the above, specifically the modification to the Reclamation Plan without public comment and notice and the inadequacy of the surety bond, I believe that an Amendment process for the Lyons Quarry Permit M1977208 that includes a public notice process is warranted. The surety bond amount must also be increased to cover the current cost of reclamation as a figure not updated over the past 20 years, is surely inadequate. Given Cemex's poor performance in the stock market, and a current liquidity ratio of only 0.87 based on the three months ending September 30, 2022, I have serious concerns about their ability to pay for proper reclamation of their Lyons property, as a ratio of less than 1 typically means that a company is facing negative working capital, and may be experiencing a liquidity crisis. I am requesting an investigation and follow up from DRMS. Thank you for your time and attention. I look forward to hearing from you soon. Sincerely, Sarah LorangNULL CT 5 1/11/2023 NULL NULL NULL NULL NULL
M2015030 Chavers Mining Resource Asphalt Specialties CO., Inc. Revise the currently approved reclamation plan to change post mining land use from developed water storage to inert backfill/rangeland.NULL Revise the currently approved reclamation plan to change post mining land use from developed water storage to inert backfill/rangeland.NULL AM 2 11/22/2022 2/3/2023 NULL 5/4/2023 NULL NULL
M2010055 Konig Borrow Pit Konig Ag Co. Surety ReductionNULL Reduce reclamation bond to cost for revegetation only - earthwork completed.NULL SR 1 1/31/2023 1/31/2023 NULL 4/3/2023 NULL NULL
M2008017 Derr Pit Broken Arrow Investments LLC Revision of the existingmining plan to reflect surface mining for Phase 7a not exposing groundwater. NULL Revision of the existingmining plan to reflect surface mining for Phase 7a not exposing groundwater. Phase 7a will be mined along with Phase 5a concurrently with Phase 6a.NULL TR 8 1/30/2023 1/30/2023 NULL 3/1/2023 NULL NULL
M1997014 Deer Creek Quarry Aggregate Industries - WCR, Inc. Transfer Permit from Aggregate Industries-WCR, Inc. to Holcim-WCR, Inc.NULL Transfer Permit from Aggregate Industries-WCR, Inc. to Holcim-WCR, Inc.NULL SO 3 1/23/2023 NULL NULL NULL NULL NULL
M1991035 Bluestone Pit Lafarge West, Inc. c/o Lafarge North America Inc. Transfer from Lafarge West, Inc.. to Holcim-MAMR, Inc.NULL NULL SO 5 1/23/2023 NULL NULL NULL NULL NULL
M1991083 Ula Pit Seifert Construction dba Seifert Enterprises, LLC Ula Pit Technical Revision to increase highwall sizeNULL Increase size of working highwall to 700' long and 25' high. NULL TR 2 1/30/2023 1/30/2023 NULL 3/1/2023 NULL NULL
M1973021 Morrison Quarry Aggregate Industries - WCR, Inc. Transfer from Aggregate Industries-WCR, Inc. to Holcim-WCR, Inc.NULL NULL SO 3 1/23/2023 NULL NULL NULL NULL NULL
M1998058 Tellier Gravel Pit Oldcastle SW Group, Inc. dba United Companies Seed mix revision and landowner's request to leave access roads and stormwater catchment area NULL NULL TR 2 10/27/2022 10/27/2022 NULL 11/28/2022 2/27/2023 NULL
M1984094 Gloria Z Mine Playfair Land Company LLC Transfer from Playfair Land Company LLC to South Park Aggregates, LLCNULL NULL SO 5 2/3/2023 NULL NULL NULL NULL NULL
M1980244 Cresson Project Cripple Creek & Victor Gold Mining Company Request to Release 4.3 Acres at the Carlton TunnelNULL Request to Release 4.3 Acres northwest of the Carlton Tunnel (Section 9, Township 16, Range 70W, 06th Principle Meridian).NULL AR 6 12/16/2022 1/25/2023 NULL 3/27/2023 NULL NULL
M1980244 Cresson Project Cripple Creek & Victor Gold Mining Company Relocate topsoil stockpiles GM11 and GM39.NULL Relocate growth medium stockpiles GM11 to two new stockpile locations (hot tire pad and STK34), and one existing stockpile (GM06). Relocate the ECOSA stockpile GM39 to a new stockpile location (Joe Dandy Road) and to the existing GM27. This will facilitate the construction activities for VLF2, Phase 3 project and ECOSA waste dump project.NULL SA 5 1/27/2023 NULL NULL NULL NULL NULL
M1994011 West End Gravel Pit #1 West End Gravel Company NULL NULL SL 2 6/28/2022 6/28/2022 NULL 8/29/2022 NULL NULL
M2018007 Project P.J. Taylor Conway Acreage Reduction to remove Mining Area #3 to account for the acreage of the AM1 access road.NULL Acreage Reduction Description: Removal of Mining Area #3 to account for the acreage of the AM1 access road. Please note, no mining activities have occurred in Mining Area #3 under M-2018-007.NULL AR 1 11/15/2021 12/2/2021 NULL 1/31/2022 5/31/2022 NULL
M1987164 Hayden Gravel Pit Oldcastle SW Group, Inc. dba United Companies Mine ExpansionNULL Proposed mine expansion to add 173.05 acres (Pod 2 &3) to existing 94.95 acres for a total of 268 acresNULL AM 4 12/22/2022 1/5/2023 NULL 4/5/2023 NULL NULL
C1982056 Foidel Creek Mine Twentymile Coal, LLC Permit Renewal No.8NULL Permit Renewal No. 8 reflects Twentymile Coal, LLCs submittal to renew the Foidel Creek Mine's permit for another five year term.NULL RN 8 11/18/2022 11/28/2022 12/31/2022 3/28/2023 NULL NULL
M2008076 Robinson Sons Gravel Pit No. 1 Robinson Sons Inc David Vigil complaint regarding inadequate structure agreement. NULL NULL CT 2 2/13/2019 NULL NULL NULL NULL NULL
M2016054 Irwin/Thomas Mine Holcim - WCR, Inc. Technical RevisionNULL NULL TR 1 12/19/2022 12/19/2022 NULL 1/18/2023 3/19/2023 NULL
M1977208 Lyons Quarry CEMEX, Inc. Citizen complaint NULL I am writing in regard to the Lyons Quarry Permit M1977208. - With the closure of CEMEX’s Dowe Flats mine on September 30, 2022, CEMEX has begun trucking in raw material from multiple distant locations, more than doubling their previous truck traffic. We have observed approximately 10 trucks per hour on US-36, and have reports of similar new truck traffic on Highway 66. - In DRMS parlance, this is an alteration, as it changes the plant from a connected "Mining Operation" to a "Custom Mill”. - DRMS has previously indicated that the mining activities still occurring at the Lyons Quarry is the processing of material mined from the Dowe Flats Mine, and if mining at the Dowe Flats Mine were to cease (which it has), that would have implications on the Lyons Quarry permit. Any changes to the previously approved plan, such as changing the primary source location of their raw materials, would need to be reviewed by DRMS through the appropriate revision submission. - DRMS also indicated that should CEMEX want to propose leaving the cement plant operations in place, this would need to be submitted to DRMS in the form of an Amendment application (to change the post-mining land use to industrial/commercial). Of course, CEMEX would need to demonstrate this proposal is compliant with local land use and zoning requirements. I believe that the recent closure of the Dowe Flats mine, and CEMEX’s decision to continue operating the plant by trucking in raw materials means that CEMEX must request an amendments to Lyons Quarry Permit M1977208, or at a minimum, file for a Technical Revision. To the best of my knowledge, neither of these have been done, and I am requesting an investigation and follow up from DRMS. Thank you very much for your time and attention. I look forward to hearing from you soon. Sincerely, Sarah LorangNULL CT 3 1/9/2023 NULL NULL NULL NULL NULL
M1977317 Cedarwood Clay Mine GCC Rio Grande, Inc. Revised Blasting PlanNULL GCC is submitting a revised blasting plan for the Cedarwood Mine. GCC purchased the Cedarwood Mine in 2021 and has since updated the blasting plan in preparation of conducting blasting activities at the mine.NULL TR 2 12/15/2022 12/15/2022 NULL 1/16/2023 NULL NULL
C1981010 Trapper Mine Trapper Mining, Inc. PR-11 5-Year Mine Plan UpdateNULL The 5-Year Mine Plan Update, comprises revised pit disturbance, reclamation, mining and a new bond calculation for permit term 2023-2027. A proposed increase of 137.10 acres of State surface in the permit area is requested bringing the current 11,157.00 acre area to 11,293.79 acres. NULL PR 11 10/14/2022 10/24/2022 12/23/2022 2/21/2023 NULL NULL
C1994082 Yoast Mine Seneca Property LLC Midterm Review Findings Dated 2 February 2023.NULL The Colorado Division of Reclamation, Mining and Safety (Division) conducted a Midterm Review of the Yoast Mine permit as to fulfill the requirements of Rules 2.08.3, 2.06.2 (10), 2.06.3 (4), 2.06.5 (2), and 3.02.2(4). The Division proposes no increase in the financial warranty amount required for the Yoast Mine as the current $713,491 bond held is more than the recent cost estimate of $656,087.NULL MT 6 2/2/2023 NULL NULL NULL NULL NULL
M1989056 Timnath Pit Don Kehn Construction, Inc. Transfer from Don Kehn Construction, Inc. to McAtee Construction CompanyNULL NULL SO 1 1/26/2023 NULL NULL NULL NULL NULL
M1994117 Gold Hill Mill Colorado Milling Company, LLC Conversion from a 110(2) limited impact to a 110(d) designated mining operation permitNULL Permit conversion to a designated mining operation based on the storage and usage of chemicals in the mill that can produce acid or toxic chemicals.NULL CN 1 9/13/2022 2/7/2023 NULL 5/8/2023 NULL NULL
M1981075 Phillips Stone Company Blue Mountain Stone, Inc. Conversion Application (CN-1) to convert the currently approved 110c for 9.9 acres to a 112c with 43 acres.NULL Conversion Application (CN-1) to convert the currently approved 110c for 9.9 acres to a 112c with 43 acres.NULL CN 1 6/22/2022 9/27/2022 11/26/2022 12/26/2022 5/24/2023 NULL
M2013028 Combination Placer Western States Minerals,LLC Transfer from Western States Minerals, LLC to Eagle Peaks Mining, LLCNULL NULL SO 1 1/13/2023 NULL NULL NULL NULL NULL
M2018007 Project P.J. Taylor Conway The construction of a new 3,435’ access road and Acreage Reduction AR1 to remove Mining Area #3 to offset the acreage of the road.NULL Amendment Description: The construction of a new 3,435’ access road and Acreage Reduction AR1 to remove Mining Area #3 to offset the acreage of the road.NULL AM 1 8/17/2021 12/2/2021 NULL 1/3/2022 5/31/2022 NULL
M2004045 Hanna Pit No. 1 Rio Grande Ranch, LLC Board Ordered Surety Forfeiture, 3/18/2022NULL NULL SF 1 4/13/2022 4/13/2022 NULL NULL NULL NULL
M1977300 Schwartzwalder Mine Colorado Legacy Land, LLC Technical RevisionNULL Groundwater Monitoring Locations; Groundwater Monitoring Sampling Plan; Surface Water Monitoring Locations; Surface Water Sampling Plan; South Waste Rock Pile Drainage Design; Identification of Topsoil Borrow Areas; and Structures Requiring Demolition.NULL TR 30 12/30/2022 12/30/2022 NULL 1/30/2023 2/28/2023 NULL
M1978249 Kokes Gravel Pit Logan County Full/Final ReleaseNULL Full/Final Release of 32.25 acres.NULL SL 1 12/2/2022 12/12/2022 NULL 2/10/2023 NULL NULL
M1995060 Butcher Pit Southway Construction Company, Inc. NULL NULL TC 2 6/13/2019 NULL NULL NULL NULL NULL
M2022006 Motorcross Borrow Pit SEMA Construction, Inc. Citizen ComplaintNULL Kevin McCarty, 2275 Alpine Sky Drive, Berthoud, CO 80513, kevin@mccartylw.com, 970-581-1953. 3/4 mile south of Hwy 56 on the east side of WCR 7 & on west side of I-25. East of Berthoud, CO My understanding is that this permit is specifically for construction of I-25. We have noticed trucks heading south and when we followed them, we discovered fill dirt was being supplied to a Mead development. This limited permit was approved without any notice or input from adjoining landowners and we are told it was approved in this manner because of the limitation in time and use for the I-25 project. An expansion of use beyond that does not seem appropriate. We discussed the original use with SEMA operator when the project started. While we don't agree with embarking on a project of this scale with no county approval and no ability for public input, we have decided not to pursue further actions regarding the use of this pit specifically for I-25. However, an expansion of use beyond that is another story.NULL CT 1 1/19/2023 NULL NULL NULL NULL NULL
M2022021 Wattenberg Disturbance Reclamation Aggregate Industries - WCR, Inc. Transfer from Aggregate Industries-WCR, Inc. to Holcim-WCR, Inc.NULL NULL SO 1 1/23/2023 1/23/2023 NULL 2/22/2023 NULL NULL
M2000080 Pioneer Farm Pioneer Sand Company, Inc. Transfer from Pioneer Sand Company Inc. to Holcim-WCR, Inc.NULL Transfer from Pioneer Sand Company Inc. to Holcim-WCR, Inc.NULL SO 1 1/24/2023 NULL NULL NULL NULL NULL
M1978051 Gaede Pit Lincoln County Technical Revision TR-5NULL This permitting action was withdrawn on 26 August 2022 and the withdrawal was approved.NULL TR 5 8/22/2022 NULL NULL NULL NULL NULL
C1981038 Bowie No. 1 Mine Bowie Resources, LLC Permit Renewal No. 8NULL This application requests a renewal of the permit for the Bowie No. 1 Mine. NULL RN 8 8/25/2022 9/6/2022 NULL 1/4/2023 3/15/2023 NULL
M1979166 Bennett's Gravel Pit Elam Construction, Inc. Surety Reduction Request Related to TR-05NULL With the approval of TR-05 in February 2022, the Division reduced the required surety for the Bennett's Gravel Pit by $91,226. SR-01 is related to that TR. NULL SR 1 12/27/2022 12/27/2022 NULL 2/27/2023 NULL NULL
M1980037HR Ingleside Quarry Pioneer Sand Company, Inc. Transfer from Pioneer Sand Company Inc. to Holcim-WCR, Inc.NULL NULL SO 4 1/24/2023 NULL NULL NULL NULL NULL
C1981022 Elk Creek Mine Oxbow Mining, LLC Partial Phase III Bond ReleaseNULL SL-8 seeks Phase III Bond Release on 9.5 acres of pads and roads. Reclamation work on the SL-8 parcels was completed between 2010 and 2012. NULL SL 8 11/9/2022 11/21/2022 12/16/2022 NULL NULL NULL
C1980007 West Elk Mine Mountain Coal Company, LLC Partial Phase II Bond ReleaseNULL Surety Release No. 16 seeks Phase II Bond Release for the reclamation of pads and roads associated with 31 Mine Ventilation Boreholes (MVBs) on the E2, 3, 4 and 5 panels, four exploration holes, and two monitoring wells. The total acreage is 20.74 acres and the reclamation was completed between 2012 and 2017.NULL SL 16 10/20/2022 11/14/2022 10/28/2022 NULL NULL NULL
C1981019 Colowyo Coal Mine Colowyo Coal Company L.P. Midterm Review Findings Dated May 5,2020NULL NULL MT 8 5/5/2020 NULL NULL NULL NULL NULL
C1981019 Colowyo Coal Mine Colowyo Coal Company L.P. TR-157 Performance Bond ReductionNULL TR-157 proposes to reduce Colowyo's reclamation liablity.NULL TR 157 12/8/2022 12/16/2022 1/20/2023 2/14/2023 NULL NULL
C1981019 Colowyo Coal Mine Colowyo Coal Company L.P. TR-158 Final East Pit Ditch Watershed RevisionNULL TR-158 proposes additional sediment control measures for the Final East Pit Ditch watershed.NULL TR 158 12/15/2022 12/23/2022 1/9/2023 2/21/2023 NULL NULL
C1980007 West Elk Mine Mountain Coal Company, LLC Partial Phase III Bond ReleaseNULL SL-17 seeks Phase III Bond Release on 9.25 acres of pads and roads associated with Mine Ventilation Boreholes (MVBs) and exploration holes situated in the West Bench, Sylvester Gulch, Shaft Canyon Road and Saddle Road areas. Reclamation work on the SL-17 parcels was completed between 2004 and 2008. NULL SL 17 11/8/2022 12/19/2022 1/6/2023 NULL NULL NULL
C1980007 West Elk Mine Mountain Coal Company, LLC Construction of 81 B-Seam Mine Ventilation Boreholes, Pads and RoadsNULL TR-147 seeks to allow for the construction of 81 Mine Ventilation Boreholes (MVBs), together with associated drill pads and access roads, above future B-seam longwall panels LWB26 through LWB29 in order to ventilate combustible gases such as methane. Each MVB is proposed to be located on a pad of approximately half an acre, with the exception of the two easternmost pads on each panel which will be co-located on pads of approximately one acre. Approximately 10 miles of new road are proposed to be constructed, with another mile of existing trail to be widened to a road.NULL TR 147 4/26/2019 5/1/2019 5/18/2019 6/30/2019 5/31/2023 NULL
C1980007 West Elk Mine Mountain Coal Company, LLC Extend longwall panel LWE12NULL TR-151 seeks to extend the currently permitted LWE12 panel to the west. It will increase the area of the panel by approximately 26 acres.NULL TR 151 11/2/2022 11/7/2022 11/26/2022 1/6/2023 8/31/2023 NULL
M1999073 Pit 1 Evan L. Melby, Inc. Full/Final Release RequestNULL NULL SL 1 1/23/2023 1/31/2023 NULL 4/3/2023 NULL NULL
M1990057 Leadville Mill Union Milling Company, LLC Conversion to 112(d)NULL Amend to include vat leach, additional surface disturbance, and a new filtered tailings deposit.NULL CN 2 2/3/2023 NULL NULL NULL NULL NULL
M2020008 Rifle Gravel Pit #1 Scott Contracting, Inc. NULL NULL AM 1 2/3/2021 NULL NULL NULL NULL NULL
M2019054 Skull Creek Uinta Mining, LLC NULL NULL AM 1 12/30/2019 1/15/2020 NULL 4/14/2020 8/1/2020 NULL
M1987013 Burton Pit Southway Construction Company, Inc. NULL increase FW to 52,786.00NULL SI 2 3/9/2020 3/9/2020 NULL 5/8/2020 NULL NULL
M2000046 Phillips Ranch Property Gravel Pit #2 Pioneer Sand Company, Inc. Transfer from Pioneer Sand Company Inc. to Holcim-WCR, Inc.NULL NULL SO 1 1/24/2023 NULL NULL NULL NULL NULL
M1987171 Fountain Colony Pit Kiewit Infrastructure Co. Release of 289.2 AcresNULL The requested release area of 289.2 acres includes the entirety of mining and reclamation areas Phase I, Phase II, Phase III, and Phase IV. Additionally, the release area includes the access road alignment and adjoining land in Phase V, which will be used to access the site for reclamation and development purposes.NULL AR 1 1/5/2023 1/5/2023 NULL 3/6/2023 NULL NULL
M1993050 Dellacroce Pit Raymond F. & Robert W. Dellacroce NULL Completed Grading and TopsoilingNULL SR 1 12/27/2022 12/30/2022 NULL 2/28/2023 NULL NULL
M1977168 Marrs Memorials Colorado Quarries Inc BLM 3-year review increaseNULL NULL SI 2 11/26/2019 11/26/2019 NULL 1/27/2020 NULL NULL
M1977210 Snyder Quarry City of Colorado Springs Noticed this morning and continuing into this afternoon that there is an EXTREME amount of trucks carrying aggregate out of the Snyder Quarry. In 19 minutes I videoed 12 loaded trucks departing the quarry.NULL NULL CT 1 4/22/2020 4/22/2020 NULL NULL NULL NULL
M1973007SG Daniels Sand Pit 2 Aggregate Industries - WCR, Inc. Transfer from Aggregate Industries-WCR, Inc. to Holcim-WCR, Inc.NULL NULL SO 3 1/23/2023 NULL NULL NULL NULL NULL
M2020023 Langston Borrow Pit Langston Concrete, Inc. Mining without a permitNULL NULL CT 1 4/22/2020 4/24/2020 NULL NULL NULL NULL
M1985112 Loloff Mine Loloff Construction, Inc. Update of Reclamation Plan to Remove Requirement of RevegetationNULL Loloff Construction, Inc. proposes updating the reclamation plan and removing the requirement of spreading topsoil and seeding 4.38 acres along the pond edge.NULL TR 4 1/11/2023 1/11/2023 NULL 2/10/2023 NULL NULL
M2020028 Big Johnson Reservoir Fountain Mutual Irrigation Company The excavation site is 5550 Goldfield Rd. Colorado Springs, 80911, and the material is being transported for site improvements to 3700 Drennan Rd. Colorado Springs, 80910NULL They have started the project we spoke about last week and have a fleet of trucks hauling. As you can see, this is a substantial amount and it's also apparent they have been doing this before if you see how far back to the right hand side of the photo the excavation goes. Please address as soon as possible. The excavation site is 5550 Goldfield Rd. Colorado Springs, 80911, and the material is being transported for site improvements to 3700 Drennan Rd. Colorado Springs, 80910 NULL CT 1 5/6/2020 5/6/2020 NULL NULL NULL NULL
C1984065 Coal Ridge No. 1 Mine C.B. Minerals Company, LLC Midterm Review Findings Dated April 2, 2019NULL NULL MT 8 4/2/2019 NULL NULL NULL NULL NULL
M2000158 S & H Mine Scout Investments, L.L.C. Complaint Regarding Well Impacts and Other ItemsNULL A complaint was received by the Division from an adjacent landowner regarding potential impacts on his well, as well as several other issues.NULL CT 1 4/6/2022 NULL NULL NULL NULL NULL
M2021020 Raindance Reservoir #2 Vima Partners, LLC Surety ReleaseNULL We want to release the original 111 permit because it is now inside the current 112 Permit.NULL SL 1 2/2/2023 NULL NULL NULL NULL NULL