File Number Site Name Permittee/Applicant Revision Subject Detailed Description Permitting Action Type Permitting Sequence Date
Submitted
Date Filed
(Complete)
Application Comments
Due Date
Decision Due Date Decision Extension Division
Decision
Decision Comments
Due Date
Division
Specialist
M1991009 White River S & G Pit White River Aggregates, Inc. Transfer from White River Aggregates, Inc. to SR Pit LLCNULL NULL SO 2 7/12/2022 NULL NULL NULL NULL NULL
M2014063 WRC Wet Pit White River City Investments LLC Transfer from White River CIty Investments to Brian and Sheryl Brock.NULL Transfer from White River CIty Investments to Brian and Sheryl Brock.NULL SO 1 5/2/2022 NULL NULL NULL NULL NULL
M1977300 Schwartzwalder Mine Colorado Legacy Land, LLC Provide a conceptual site model, a plan addressing the physical and chemical stabilization of the mine pool,specifically addressing the concentrations of dissolved uranium and other constituents as required under the conditions of the permit, and updated reclamation and environmental protection plans. Provide a plan addressing the long term cost of operating the water treatment plant and managing the mine pool, based on a minimum of 3 consecutive years of data which verify the physical and chemical stabilization of the mine pool.NULL NULL AM 6 6/23/2021 7/29/2021 9/15/2021 10/27/2021 7/29/2022 NULL
M1977208 Lyons Quarry CEMEX, Inc. Complaint regarding fugitive dust event that occurred at the site on January 31, 2021.NULL NULL CT 2 2/8/2022 NULL NULL NULL NULL NULL
M1977342 Henderson Mine Climax Molybdenum Company CDPHE Complaint forwarded to DRMS NULL Caller reported to CDPHE observing white crystalline material blowing onto the tailings pond and the river,NULL CT 1 5/26/2022 5/26/2022 NULL NULL NULL NULL
M1977439 Home Office Mine Martin Marietta Materials, Inc. Update mining and reclamation plans and maps to reflect existing and proposed conditions, including modifying Stage G from open water pond to lined water storage.NULL Update mining and reclamation plans and maps to reflect existing and proposed conditions, including modifying Stage G from open water pond to lined water storage. No new acreage is being added to the permit.NULL AM 4 12/23/2021 1/10/2022 NULL 4/11/2022 9/9/2022 NULL
M2010071 Goose Haven Reservoir #2- Complex Expansion The City of Lafayette Goose Haven Reservoirs Complex Expansion #2 and #4NULL Adding a new cell that will be a clay lined reservoir with a Low Hazard Jurisdictional Embankment Dam.NULL AM 2 7/22/2021 10/11/2021 NULL 1/10/2022 8/26/2022 NULL
M2010071 Goose Haven Reservoir #2- Complex Expansion The City of Lafayette Technical Revision 1NULL Revision to re-define topsoil to be used for reclamationNULL TR 1 7/1/2022 NULL NULL NULL NULL NULL
M2008009 Lyster Pit Oldcastle SW Group, Inc. dba United Companies Acrage reduction request of 37.1 acres.NULL Acrage reduction request of 37.1 acres.NULL AR 1 7/27/2020 8/5/2020 NULL 10/5/2020 NULL NULL
M2009079 Peroulis Brothers Snake River Pit Precision Excavating, Inc. Precision Excavating, Inc. is requesting a full and final release of 101 acres.NULL Precision Excavating, Inc. is requesting a full release of 101 acres at the Peroulis Brothers Snake River Pit. This request is for the full and final release of the entire permit area.NULL SL 1 10/22/2021 11/2/2021 NULL 1/3/2022 NULL NULL
M2009079 Peroulis Brothers Snake River Pit Precision Excavating, Inc. Request for Surety ReductionNULL Precision Excavating, Inc proposes a surety reduction for the Peroulis Brothers Snake River Pit to reduce the bond for the site to the amount required to complete the seeding of vegetation.NULL SR 1 10/27/2020 11/6/2020 NULL 1/5/2021 NULL NULL
M2021052 Rifle Gravel Pit #1 Scott Contracting, Inc. Amendment #1 requests to change the mining method.NULL IHC Scott, Inc. has applied for an Ammendment to the Rifle Gravel Pit #1 to revise the mining method at the site to be changed to wet mining methodology.NULL AM 1 4/20/2022 4/29/2022 NULL 7/28/2022 9/23/2022 NULL
C1981041 Roadside Portals Snowcap Coal Company, Inc Permit Renewal No 8NULL Snowcap Coal Company, Inc. has submitted an application for renewal of the Roadside Portals in accordance with Rule 2.08.5(2). No coal extraction is anticipated, and only reclamation and maintenance activiites are anticipated during this permit term.NULL RN 8 6/22/2022 6/27/2022 NULL 10/25/2022 NULL NULL
C1980004 McClane Canyon Mine ARC McClane Canyon, LLC Revise Inspection and Permitting ContactNULL Revise Inspection and Permitting Contact for the ARC McClane Canyon, LLC Update Appendix ENULL MR 64 8/5/2022 NULL NULL NULL NULL NULL
C1981018 Deserado Mine Blue Mountain Energy, Inc TR-74 RP-2/3/4/5 CombinationNULL TR-74 requests permission to combine current refuse pits RP-2/3/4 and 5A together into refuse pit RP-2/3/4/5.NULL TR 74 4/28/2022 5/4/2022 NULL 7/3/2022 9/1/2022 NULL
M1979142 West of Maybell Pit Colorado Department of Transportation NULL NULL SL 1 8/24/2021 NULL NULL NULL NULL NULL
M2001069 Del Norte West Valley Pit Asphalt Constructors, Inc. Phase VNULL We are requesting to open up Phase V for extraction and material stockpiling purposes.NULL TR 2 6/15/2022 6/15/2022 NULL 7/15/2022 8/5/2022 NULL
C1996084 Lorencito Canyon Mine New Elk Coal Company, LLC Permit Renewal No, 5NULL This application is to renew the Lorencito Canyon Mine permit, which expires November 7, 2022.NULL RN 5 4/27/2022 4/29/2022 NULL 8/27/2022 NULL NULL
C1996084 Lorencito Canyon Mine New Elk Coal Company, LLC 2020 Midterm ReviewNULL NULL MT 5 5/5/2020 5/5/2020 NULL NULL NULL NULL
M1996013 Hasty Pit Carder, Inc. NULL NULL CS 2 1/28/2020 NULL NULL NULL NULL NULL
M1994011 West End Gravel Pit #1 West End Gravel Company Full/Final ReleaseNULL NULL SL 1 6/28/2022 6/28/2022 NULL 8/29/2022 NULL NULL
M1994011 West End Gravel Pit #1 West End Gravel Company NULL NULL SL 2 6/28/2022 6/28/2022 NULL 8/29/2022 NULL NULL
M1995057 Rudibaugh Pit Deb Rudibaugh Forfeit FW MV-2021-002NULL NULL CS 3 10/20/2021 10/22/2021 NULL NULL NULL NULL
M1977305 C-LP-21 Mine Highbury Resources Inc. End TC to Reclamation StatusNULL NULL CS 1 2/3/2020 6/23/2021 NULL NULL NULL NULL
M1978093 Newett Quarry Pete Lien & Sons, Inc. Temporary Cessation NoticeNULL NULL TC 4 11/12/2021 NULL NULL NULL NULL NULL
M1984014 C-JD-8 Highbury Resources Inc. NULL NULL TC 3 4/1/2019 NULL NULL NULL NULL NULL
M2021058 Arkansas Valley Slag (AVS) CJK Milling Company, LLC Request for Technical RevisionNULL NULL TR 1 4/11/2022 NULL NULL NULL NULL NULL
M2003092 Gray Pit #1 Nick H. Gray Transfer from Nick H Gray to Lewis Energy Lands, LLCNULL NULL SO 1 3/7/2022 NULL NULL NULL NULL NULL
M2006084 White River City Pit Oldcastle SW Group, Inc. dba United Companies Technical RevisonNULL NULL TR 1 7/29/2022 NULL NULL NULL NULL NULL
M2008083 Black Cloud Mine Resurrection Mining Company Complaint from Brian Werderman - downstream property owner: Blown out beaver dams, sedimentationNULL NULL CT 1 7/8/2019 NULL NULL NULL NULL NULL
M2017014 Cottonwood Pass Pit Oldcastle SW Group, Inc. dba United Companies NULL NULL SL 1 6/27/2022 6/27/2022 NULL 8/26/2022 NULL NULL
M2017025 Cottonwood Pass Pit Oldcastle Southwest Group, Inc. dba United Companies NULL NULL SL 1 6/27/2022 6/27/2022 NULL 8/26/2022 NULL NULL
M1987026 Black Obsidian Colorado Quarries Inc Convert to 112c Permit by adding 136.67ac for a total permit area of 145.67acNULL Application to convert from a 110c to a 112c construction materials permit by adding 136.67ac for a total permit area of 145.67ac.NULL CN 1 7/19/2021 8/2/2021 NULL 11/1/2021 8/2/2022 NULL
M1974004 Specification Aggregates Quarry Martin Marietta Materials, Inc. AM04 to add 64.13 ac to south side of currently permitted areaNULL This amendment is for the addition of 64.13 acres on the south boundary of the existing permit as shown on submitted mapsNULL AM 4 4/20/2022 4/26/2022 6/15/2022 7/25/2022 8/25/2022 NULL
M1977151 Greeley Pit R M Hiner Construction Co Inc Placement of backfill to eliminate excess GW exposureNULL Revision to clarify amount of backfill required and where on-site it will be placed to eliminate the excess groundwater exposure at the site for final reclamation.NULL TR 3 8/8/2022 8/8/2022 NULL 9/7/2022 NULL NULL
M1991080 Van Egmond Stone Pit Russell Van Egmond Conversion CN-1NULL NULL CN 1 3/23/2022 NULL NULL NULL NULL NULL
M1982044 Glen Johnston Site 1 Jerry Johnston Transfer from Jerry Johnston to Craig PesterNULL NULL SO 3 8/9/2022 NULL NULL NULL NULL NULL
M1980244 Cresson Project Cripple Creek & Victor Gold Mining Company Acreage Release Request - 4.3 AcresNULL NULL AR 5 8/16/2021 NULL NULL NULL NULL NULL
M1980244 Cresson Project Cripple Creek & Victor Gold Mining Company Closure stormwater design updatesNULL Newmont Corporation’s Cripple Creek and Victor Gold Mining Company (CC&V) hereby provides Technical Revision (TR) 131 documenting updated closure stormwater designs; as committed to during the second and third adequacy reviews of the CC&V Amendment 13 (AM-13).NULL TR 131 3/24/2022 3/24/2022 NULL 4/25/2022 8/23/2022 NULL
M2018007 Project P.J. Taylor Conway The construction of a new 3,435’ access road and Acreage Reduction AR1 to remove Mining Area #3 to offset the acreage of the road.NULL Amendment Description: The construction of a new 3,435’ access road and Acreage Reduction AR1 to remove Mining Area #3 to offset the acreage of the road.NULL AM 1 8/17/2021 12/2/2021 NULL 1/3/2022 5/31/2022 NULL
M2018007 Project P.J. Taylor Conway Acreage Reduction to remove Mining Area #3 to account for the acreage of the AM1 access road.NULL Acreage Reduction Description: Removal of Mining Area #3 to account for the acreage of the AM1 access road. Please note, no mining activities have occurred in Mining Area #3 under M-2018-007.NULL AR 1 11/15/2021 12/2/2021 NULL 1/31/2022 5/31/2022 NULL
M2013040 Godsend Claim- CMC 252626 Richard Fretterd Request for Full/Final ReleaseNULL Request for Full/Final ReleaseNULL SL 2 7/25/2022 7/27/2022 NULL 9/26/2022 NULL NULL
M2019055 D Family Jewels James and Yvette Downing Request for Full/Final ReleaseNULL Request for Full/Final ReleaseNULL SL 1 7/18/2022 7/27/2022 NULL 9/26/2022 NULL NULL
M2019050 Robert Michael #1-A Robert and Lauren Berry Surety ReleaseNULL Full/Final Release of Entire Permitted AreaNULL SL 1 6/27/2022 7/6/2022 NULL 9/5/2022 NULL NULL
C2010089 New Horizon North Mine Elk Ridge Mining and Reclamation, LLC MR-32 Certificate of Liability InsuranceNULL MR-32 provides an updated certificate of liability insurance for Elk Ridge Mining and Reclamation, LLC.NULL MR 32 8/2/2022 8/2/2022 NULL 8/12/2022 NULL NULL
C2010089 New Horizon North Mine Elk Ridge Mining and Reclamation, LLC Partial Phase II and Phase III Bond ReleaseNULL Elk Ridge Mining and Reclamation is requesting Phase II bond release on 118.6 acres of irrigated pasture and dryland pasture, and Phase III bond release on 3.7 acres of a reclaimed sediment control structure.NULL SL 3 1/20/2022 2/17/2022 NULL 4/24/2022 NULL NULL
C1981035 King Coal Mine GCC Energy, LLC Permit Renewal No. 8NULL GCC Energy, LLC has applied for a permit renewal of the King I & II Mine.NULL RN 8 2/18/2022 2/28/2022 NULL 6/28/2022 8/26/2022 NULL
C1981008 New Horizon Mine Elk Ridge Mining and Reclamation, LLC MR-122 Certificate of InsuranceNULL MR-122 provides a new certificate of insurance for Elk Ridge Mining and Reclamation, LLC.NULL MR 122 8/2/2022 8/2/2022 NULL 8/12/2022 NULL NULL
C1981008 New Horizon Mine Elk Ridge Mining and Reclamation, LLC PR-09 Prime Farmland RelocationNULL PR-09 proposes to relocate 4 acres of Prime Farmland reclamation to a location with greater accessibility to agricultural managementNULL PR 9 4/21/2022 4/29/2022 6/4/2022 8/27/2022 NULL NULL
C1981008 New Horizon Mine Elk Ridge Mining and Reclamation, LLC Phase I, II & III Bond ReleaseNULL The permittee is requesting Phase I, II and III bond release for nine (9) plugged and abandoned monitoring wells, and two (2) plugged and abandoned backfill wells. The permittee is requesting Phase I release on 24.5 acres that have been backfilled and graded. The permittee is requesting Phase II release on 11.4 acres of dryland pasture and irrigated pasture reclaimed areas.NULL SL 25 5/16/2022 7/5/2022 7/16/2022 NULL NULL NULL
C1981012 New Elk Mine New Elk Coal Company, LLC Surety IncreaseNULL The Division proposes a requried surety increase for the New Elk Mine (C-1981-012). This increase in required surety is a result of the Division's review and update of the reclamation cost estimate for the site. NULL SI 4 8/2/2022 NULL NULL NULL NULL NULL
M2008076 Robinson Sons Gravel Pit No. 1 Robinson Sons Inc David Vigil complaint regarding inadequate structure agreement. NULL NULL CT 2 2/13/2019 NULL NULL NULL NULL NULL
M2003002 Ghost River Gravel Pit HCR High Country Repair Surety incrrease to cover the cost of reclamation at the site.NULL NULL SI 2 8/26/2021 8/26/2021 NULL 10/25/2021 1/15/2022 NULL
M1977560 Rocky Ford East Pit Valco, LLC Full and final release request of permitted area.NULL Full and final release request of permitted area.NULL SL 1 6/27/2022 6/30/2022 NULL 8/29/2022 NULL NULL
M1977208 Lyons Quarry CEMEX, Inc. Description of CKD Material Handling Plan and associated dust control measures.NULL Description of CKD Material Handling Plan and associated dust control measures.NULL TR 17 6/30/2022 6/30/2022 NULL 8/1/2022 8/31/2022 NULL
M1981075 Phillips Stone Company Blue Mountain Stone, Inc. Conversion No.1NULL NULL CN 1 6/22/2022 NULL NULL NULL NULL NULL
C1981022 Elk Creek Mine Oxbow Mining, LLC Partial Phase II Bond Release ApplicationNULL SL-6 seeks Phase II Bond Release on 35.63 acres spread over three parcels; the Elk Creek Corridor, the West Valley Fill and the II West Valley Fill. Reclamation work on the SL-6 parcels was completed between 2002 and 2018. NULL SL 6 10/27/2021 11/29/2021 12/24/2021 NULL NULL NULL
C1981022 Elk Creek Mine Oxbow Mining, LLC Partial Phase III Bond Release ApplicationNULL SL-7 seeks Phase III Bond Release on 21.24 acres of reclaimed drill pads and roads. Reclamation of the SL-7 parcels was completed during 2011. NULL SL 7 4/26/2022 4/27/2022 4/29/2022 9/10/2022 NULL NULL
C1980007 West Elk Mine Mountain Coal Company, LLC Partial Phase I Bond ReleaseNULL Surety Release No. 15 seeks Phase I Bond Release for the plugging and abandonment of 9 Mine Ventilation Boreholes (MVBs) and the backfilling and regrading of associated pads and roads in the Dry Fork of Minnesota Creek area, comprising a total of approximately 7.65 acres.NULL SL 15 1/26/2022 4/8/2022 3/25/2022 9/12/2022 NULL NULL
C1980007 West Elk Mine Mountain Coal Company, LLC Construction of 81 B-Seam Mine Ventilation Boreholes, Pads and RoadsNULL TR-147 seeks to allow for the construction of 81 Mine Ventilation Boreholes (MVBs), together with associated drill pads and access roads, above future B-seam longwall panels LWB26 through LWB29 in order to ventilate combustible gases such as methane. Each MVB is proposed to be located on a pad of approximately half an acre, with the exception of the two easternmost pads on each panel which will be co-located on pads of approximately one acre. Approximately 10 miles of new road are proposed to be constructed, with another mile of existing trail to be widened to a road.NULL TR 147 4/26/2019 5/1/2019 5/18/2019 6/30/2019 10/31/2022 NULL
C1980007 West Elk Mine Mountain Coal Company, LLC Revision to layout of E-seam panelsNULL TR-150 seeks to revise the layout of E-seam panels, replacing previously permitted panel LWE9 with three smaller panels, LWE15, LWE16 and LWE17NULL TR 150 12/31/2021 1/10/2022 1/29/2022 3/11/2022 9/30/2022 NULL
M1979010 Avery Construction Pit ACA Products, Inc. Amendment to Increase the Mine AcreageNULL Amendment to increase the Mine Acreage by 107.1 acres for a proposed new permit area of 238.46 AcresNULL AM 3 5/17/2022 5/23/2022 NULL 8/22/2022 NULL NULL
M2004045 Hanna Pit No. 1 Rio Grande Ranch, LLC Board Ordered Surety Forfeiture, 3/18/2022NULL NULL SF 1 4/13/2022 4/13/2022 NULL NULL NULL NULL
M2012032 Revenue Mine Ouray Silver Mines Inc. Expansion to Accommodate Refuge Chamber and Secondary EscapewayNULL The scope of Amendment 2 is limited to expanding the affected lands boundary in Governor Basin to accommodate disturbance associated with contruction of a refuge chamber and secondary escapeway.NULL AM 2 12/3/2021 12/13/2021 1/27/2022 3/14/2022 9/1/2022 NULL
M2020008 Rifle Gravel Pit #1 Scott Contracting, Inc. NULL NULL AM 1 2/3/2021 NULL NULL NULL NULL NULL
M2021035 Smith Pit Yuma County Operator is storing fuel on site, stockpiles are not in the approved location, topsoil is not seeded to control erosion.NULL Complaint alleges that the mine operators are not following the mining plan or the reclamation plan, storing 1000 gallons of fuel on site with no containment. Mine plan states no on-site fuel storage in permitted area.NULL CT 1 8/8/2022 NULL NULL NULL NULL NULL
M2021024 Achieve More Agricultural Complex Site New Vision Investments, LLC Surety ReleaseNULL NULL SL 1 6/15/2022 6/15/2022 NULL 8/15/2022 NULL NULL
M2009086 Pickering Family Pit Flintstone Gravel Pit Inc. Amendment application to add 16.84 acres to the existing 19.90 acre site for a total permit area of 36.74 acres.NULL Amendment application to add 16.84 acres to the existing 19.90 acre site for a total permit area of 36.74 acres.NULL AM 1 4/21/2022 6/9/2022 NULL 9/7/2022 NULL NULL
M2001068 Bottomless Pit Tamrock Gravel LLC Full/Final Release RequestNULL Full/Final Release RequestNULL SL 1 6/28/2022 6/28/2022 NULL 8/29/2022 NULL NULL
M1978051 Gaede Pit Lincoln County Acreage ReductionNULL Request to remove one acre from the permit area that has not been affected. NULL AR 1 7/8/2022 7/28/2022 NULL 9/26/2022 NULL NULL
M1985105 Harold Eichman Gravel Pit Lincoln County Conversion No.1NULL NULL CN 1 6/28/2022 7/11/2022 NULL 10/10/2022 NULL NULL
C1981010 Trapper Mine Trapper Mining, Inc. RN-08 Permit RenewalNULL Trapper Mine Permit Renewal RN-08 application for the upcoming five-year permit term, 2023-2027.NULL RN 8 6/30/2022 7/2/2022 NULL 10/30/2022 NULL NULL
C1981028 Keenesburg Strip Mine Coors Energy Company Phase I Bond ReleaseNULL This application requests Phase I release of a large portion of the remaining permit area. NULL SL 11 6/21/2022 8/4/2022 8/13/2022 NULL NULL NULL
C1981038 Bowie No. 1 Mine Bowie Resources, LLC Request for Phase III at the West MineNULL SL-08 will release approximately 13.1 acres from the West Mine of the Bowie No. 1 Mine permit.NULL SL 8 5/24/2022 6/23/2022 6/10/2022 NULL NULL NULL
C1996083 Bowie No. 2 Mine Bowie Resources, LLC Permit Renewal No. 5NULL The operator has applied to renew permit C-1996-083 for another five-year term.NULL RN 5 9/23/2021 9/27/2021 1/21/2022 1/25/2022 11/18/2022 NULL
M1985112 Loloff Mine Loloff Construction, Inc. Full/Final ReleaseNULL This application is for release of the entire permitted area and a reduction of the required bond amount to $0.00.NULL SL 2 6/28/2022 6/29/2022 NULL 8/29/2022 NULL NULL
M1983209 Benton Dawson Gravel Frank Gilmore Update of Drainage in Reclamation PlanNULL This technical revision updates the Reclamation Plan to match the current grading and surface waer management within the pit floor. NULL TR 3 7/26/2022 7/26/2022 NULL 8/25/2022 NULL NULL
M1998105 Delta Paving Gravel Pit Grand Junction Pipe & Supply Co. Addition of 63.4 Acres to the Permit, Revision of Mining and Reclamation PlansNULL This amendment proposes the addition of 63.4 acres to the permit area and revises the mining and reclamation plans.NULL AM 1 5/6/2022 6/6/2022 NULL 9/5/2022 NULL NULL
M2000158 S & H Mine Scout Investments, L.L.C. Complaint Regarding Well Impacts and Other ItemsNULL A complaint was received by the Division from an adjacent landowner regarding potential impacts on his well, as well as several other issues.NULL CT 1 4/6/2022 NULL NULL NULL NULL NULL
M1995060 Butcher Pit Southway Construction Company, Inc. NULL NULL TC 2 6/13/2019 NULL NULL NULL NULL NULL
M1987013 Burton Pit Southway Construction Company, Inc. NULL increase FW to 52,786.00NULL SI 2 3/9/2020 3/9/2020 NULL 5/8/2020 NULL NULL
M2019054 Skull Creek Uinta Mining, LLC NULL NULL AM 1 12/30/2019 1/15/2020 NULL 4/14/2020 8/1/2020 NULL
M2020023 Langston Borrow Pit Langston Concrete, Inc. Mining without a permitNULL NULL CT 1 4/22/2020 4/24/2020 NULL NULL NULL NULL
M2020028 Big Johnson Reservoir Fountain Mutual Irrigation Company The excavation site is 5550 Goldfield Rd. Colorado Springs, 80911, and the material is being transported for site improvements to 3700 Drennan Rd. Colorado Springs, 80910NULL They have started the project we spoke about last week and have a fleet of trucks hauling. As you can see, this is a substantial amount and it's also apparent they have been doing this before if you see how far back to the right hand side of the photo the excavation goes. Please address as soon as possible. The excavation site is 5550 Goldfield Rd. Colorado Springs, 80911, and the material is being transported for site improvements to 3700 Drennan Rd. Colorado Springs, 80910 NULL CT 1 5/6/2020 5/6/2020 NULL NULL NULL NULL
M2019021 Buss Barrow Pit Fremont Paving & Redi-Mix, Inc. Full/Final Release of Entire Permitted AreaNULL NULL SL 1 7/25/2022 7/26/2022 NULL 9/26/2022 NULL NULL
M1982155 Fountain Pit Schmidt Construction Company Update and Modernize the 36 Year old permitNULL NULL TR 3 7/1/2022 7/5/2022 NULL 8/4/2022 9/18/2022 NULL
M1981044 Solberg Pit Solberg Gravel LLC Solberg Pit Amendment-03NULL Solberg Gravel LLC is submitting an amendment to the amendment application that will relocate the east affected area boundary to align with the permit boundaryNULL AM 3 11/17/2021 5/2/2022 NULL 8/1/2022 8/19/2022 NULL
M1980244 Cresson Project Cripple Creek & Victor Gold Mining Company Stormwater control improvements in the vicinity of the High Grade MillNULL Stormwater control improvements in the vicinity of the High Grade MillNULL TR 130 1/20/2022 1/20/2022 NULL 2/21/2022 8/19/2022 NULL
M1997064 Salt Canyon Project GCC Rio Grande, Inc. Updated Mining Plan and Disturbed Acreage IncreaseNULL NULL TR 3 5/27/2022 5/31/2022 NULL 6/30/2022 8/12/2022 NULL
M2002096 Ranch Land Rock Pit #1 Holcim (US) Inc. Notice of Temporary CessationNULL NULL TC 3 6/3/2022 6/6/2022 NULL 7/6/2022 8/17/2022 NULL
M1977168 Marrs Memorials Colorado Quarries Inc BLM 3-year review increaseNULL NULL SI 2 11/26/2019 11/26/2019 NULL 1/27/2020 NULL NULL
M1977210 Snyder Quarry City of Colorado Springs Noticed this morning and continuing into this afternoon that there is an EXTREME amount of trucks carrying aggregate out of the Snyder Quarry. In 19 minutes I videoed 12 loaded trucks departing the quarry.NULL NULL CT 1 4/22/2020 4/22/2020 NULL NULL NULL NULL
M1977211 Pikeview Quarry Continental Materials Corporation Castle Concrete, the owner /operator, has an agreement with the City of Colorado Springs to quarry 9.3 acres north of the existing Mining Permit area and the adjacent “affected area”NULL I would like to follow up on additional, new mining which has been proposed for the Pikeview Quarry. Castle Concrete, the owner /operator, has an agreement with the City of Colorado Springs to quarry 9.3 acres north of the existing Mining Permit area and the adjacent “affected area”. For your reference, I have attached a copy of the agreement, which permits / anticipates the mining of 2,200,000 cubic yards of material from that 9.3 acre site. This property appears to be outside the currently permitted area with the parties’ description of the work is described below: “work that will lower the elevation of a ridge and require reseeding in the area.” “The excavation of 2.2M cubic yards of material from land to the north of the quarry is expected to change the topography of a double ridge line.” I recall from submissions for AM-04, the quarry owner clearly stated the quarry reclamation could be done without “a single cubic yard” of dirt from the property the City purchased. Is a permit needed for this expansion and change to the reclamation plans?NULL CT 1 2/18/2022 2/18/2022 NULL NULL NULL NULL
M1977211 Pikeview Quarry Continental Materials Corporation Increase compacted lift thickness to 24" maximum for site reclamation.NULL Increase compacted lift thickness from 12" maximum to 24" maximum for site reclamation.NULL TR 21 8/2/2022 8/2/2022 NULL 9/1/2022 NULL NULL
M1978009 Apache 9 General Shale Brick, Inc. Surety ReductionNULL NULL SR 1 6/28/2022 NULL NULL NULL NULL NULL
C1984065 Coal Ridge No. 1 Mine C.B. Minerals Company, LLC Midterm Review Findings Dated April 2, 2019NULL NULL MT 8 4/2/2019 NULL NULL NULL NULL NULL
C1981012 New Elk Mine New Elk Coal Company, LLC Proposed new haul road. NULL This revision (TR76) proposes to change a currently approved light use road to a haul road and extends the haul road for a total length of about 2.7 miles. This permit boundary extension represents 11.3 acres and the proposed additional affected area was historically disturbed in the former railroad bed (including side slopes, culverts, and access trails). The disturbed area is the running surface of the new road (along with berms or other areas of disturbance associated with construction of the road) that represents 6.4 acres (see proposed Map 1 and Map 15a). NULL TR 76 10/26/2021 6/21/2022 NULL 8/20/2022 NULL NULL
C1981019 Colowyo Coal Mine Colowyo Coal Company L.P. Midterm Review Findings Dated May 5,2020NULL NULL MT 8 5/5/2020 NULL NULL NULL NULL NULL
C1981019 Colowyo Coal Mine Colowyo Coal Company L.P. Permit Renewal No 8NULL Colowyo Mine Permit Renewal No. 8. NULL RN 8 4/18/2022 4/26/2022 7/5/2022 8/24/2022 NULL NULL
M1981276 Hertzog Pit Bower Brothers Construction, Inc. Amendment 1NULL AM1 proposes to incorporate two seperate pits into one permit which will increase the permit boundry by 161 acres to a total of 241 acres.NULL AM 1 3/28/2022 6/1/2022 NULL 8/30/2022 NULL NULL