File Number | Site Name | Permittee/Applicant | Revision Subject | Detailed Description | Permitting Action Type | Permitting Sequence | Date Submitted |
Date Filed (Complete) |
Application Comments Due Date |
Decision Due Date | Decision Extension | Division Decision |
Decision Comments Due Date |
Division Specialist |
M1991009 | White River S & G Pit | White River Aggregates, Inc. | Transfer from White River Aggregates, Inc. to SR Pit LLCNULL | NULL | SO | 2 | 7/12/2022 | NULL | NULL | NULL | NULL | NULL | ||
M2014063 | WRC Wet Pit | White River City Investments LLC | Transfer from White River CIty Investments to Brian and Sheryl Brock.NULL | Transfer from White River CIty Investments to Brian and Sheryl Brock.NULL | SO | 1 | 5/2/2022 | NULL | NULL | NULL | NULL | NULL | ||
M1977300 | Schwartzwalder Mine | Colorado Legacy Land, LLC | Provide a conceptual site model, a plan addressing the physical and chemical stabilization of the mine pool,specifically addressing the concentrations of dissolved uranium and other constituents as required under the conditions of the permit, and updated reclamation and environmental protection plans. Provide a plan addressing the long term cost of operating the water treatment plant and managing the mine pool, based on a minimum of 3 consecutive years of data which verify the physical and chemical stabilization of the mine pool.NULL | NULL | AM | 6 | 6/23/2021 | 7/29/2021 | 9/15/2021 | 10/27/2021 | 7/29/2022 | NULL | ||
M1977208 | Lyons Quarry | CEMEX, Inc. | Complaint regarding fugitive dust event that occurred at the site on January 31, 2021.NULL | NULL | CT | 2 | 2/8/2022 | NULL | NULL | NULL | NULL | NULL | ||
M1977342 | Henderson Mine | Climax Molybdenum Company | CDPHE Complaint forwarded to DRMS NULL | Caller reported to CDPHE observing white crystalline material blowing onto the tailings pond and the river,NULL | CT | 1 | 5/26/2022 | 5/26/2022 | NULL | NULL | NULL | NULL | ||
M1977439 | Home Office Mine | Martin Marietta Materials, Inc. | Update mining and reclamation plans and maps to reflect existing and proposed conditions, including modifying Stage G from open water pond to lined water storage.NULL | Update mining and reclamation plans and maps to reflect existing and proposed conditions, including modifying Stage G from open water pond to lined water storage. No new acreage is being added to the permit.NULL | AM | 4 | 12/23/2021 | 1/10/2022 | NULL | 4/11/2022 | 9/9/2022 | NULL | ||
M2010071 | Goose Haven Reservoir #2- Complex Expansion | The City of Lafayette | Goose Haven Reservoirs Complex Expansion #2 and #4NULL | Adding a new cell that will be a clay lined reservoir with a Low Hazard Jurisdictional Embankment Dam.NULL | AM | 2 | 7/22/2021 | 10/11/2021 | NULL | 1/10/2022 | 8/26/2022 | NULL | ||
M2010071 | Goose Haven Reservoir #2- Complex Expansion | The City of Lafayette | Technical Revision 1NULL | Revision to re-define topsoil to be used for reclamationNULL | TR | 1 | 7/1/2022 | NULL | NULL | NULL | NULL | NULL | ||
M2008009 | Lyster Pit | Oldcastle SW Group, Inc. dba United Companies | Acrage reduction request of 37.1 acres.NULL | Acrage reduction request of 37.1 acres.NULL | AR | 1 | 7/27/2020 | 8/5/2020 | NULL | 10/5/2020 | NULL | NULL | ||
M2009079 | Peroulis Brothers Snake River Pit | Precision Excavating, Inc. | Precision Excavating, Inc. is requesting a full and final release of 101 acres.NULL | Precision Excavating, Inc. is requesting a full release of 101 acres at the Peroulis Brothers Snake River Pit. This request is for the full and final release of the entire permit area.NULL | SL | 1 | 10/22/2021 | 11/2/2021 | NULL | 1/3/2022 | NULL | NULL | ||
M2009079 | Peroulis Brothers Snake River Pit | Precision Excavating, Inc. | Request for Surety ReductionNULL | Precision Excavating, Inc proposes a surety reduction for the Peroulis Brothers Snake River Pit to reduce the bond for the site to the amount required to complete the seeding of vegetation.NULL | SR | 1 | 10/27/2020 | 11/6/2020 | NULL | 1/5/2021 | NULL | NULL | ||
M2021052 | Rifle Gravel Pit #1 | Scott Contracting, Inc. | Amendment #1 requests to change the mining method.NULL | IHC Scott, Inc. has applied for an Ammendment to the Rifle Gravel Pit #1 to revise the mining method at the site to be changed to wet mining methodology.NULL | AM | 1 | 4/20/2022 | 4/29/2022 | NULL | 7/28/2022 | 9/23/2022 | NULL | ||
C1981041 | Roadside Portals | Snowcap Coal Company, Inc | Permit Renewal No 8NULL | Snowcap Coal Company, Inc. has submitted an application for renewal of the Roadside Portals in accordance with Rule 2.08.5(2). No coal extraction is anticipated, and only reclamation and maintenance activiites are anticipated during this permit term.NULL | RN | 8 | 6/22/2022 | 6/27/2022 | NULL | 10/25/2022 | NULL | NULL | ||
C1980004 | McClane Canyon Mine | ARC McClane Canyon, LLC | Revise Inspection and Permitting ContactNULL | Revise Inspection and Permitting Contact for the ARC McClane Canyon, LLC Update Appendix ENULL | MR | 64 | 8/5/2022 | NULL | NULL | NULL | NULL | NULL | ||
C1981018 | Deserado Mine | Blue Mountain Energy, Inc | TR-74 RP-2/3/4/5 CombinationNULL | TR-74 requests permission to combine current refuse pits RP-2/3/4 and 5A together into refuse pit RP-2/3/4/5.NULL | TR | 74 | 4/28/2022 | 5/4/2022 | NULL | 7/3/2022 | 9/1/2022 | NULL | ||
M1979142 | West of Maybell Pit | Colorado Department of Transportation | NULL | NULL | SL | 1 | 8/24/2021 | NULL | NULL | NULL | NULL | NULL | ||
M2001069 | Del Norte West Valley Pit | Asphalt Constructors, Inc. | Phase VNULL | We are requesting to open up Phase V for extraction and material stockpiling purposes.NULL | TR | 2 | 6/15/2022 | 6/15/2022 | NULL | 7/15/2022 | 8/5/2022 | NULL | ||
C1996084 | Lorencito Canyon Mine | New Elk Coal Company, LLC | Permit Renewal No, 5NULL | This application is to renew the Lorencito Canyon Mine permit, which expires November 7, 2022.NULL | RN | 5 | 4/27/2022 | 4/29/2022 | NULL | 8/27/2022 | NULL | NULL | ||
C1996084 | Lorencito Canyon Mine | New Elk Coal Company, LLC | 2020 Midterm ReviewNULL | NULL | MT | 5 | 5/5/2020 | 5/5/2020 | NULL | NULL | NULL | NULL | ||
M1996013 | Hasty Pit | Carder, Inc. | NULL | NULL | CS | 2 | 1/28/2020 | NULL | NULL | NULL | NULL | NULL | ||
M1994011 | West End Gravel Pit #1 | West End Gravel Company | Full/Final ReleaseNULL | NULL | SL | 1 | 6/28/2022 | 6/28/2022 | NULL | 8/29/2022 | NULL | NULL | ||
M1994011 | West End Gravel Pit #1 | West End Gravel Company | NULL | NULL | SL | 2 | 6/28/2022 | 6/28/2022 | NULL | 8/29/2022 | NULL | NULL | ||
M1995057 | Rudibaugh Pit | Deb Rudibaugh | Forfeit FW MV-2021-002NULL | NULL | CS | 3 | 10/20/2021 | 10/22/2021 | NULL | NULL | NULL | NULL | ||
M1977305 | C-LP-21 Mine | Highbury Resources Inc. | End TC to Reclamation StatusNULL | NULL | CS | 1 | 2/3/2020 | 6/23/2021 | NULL | NULL | NULL | NULL | ||
M1978093 | Newett Quarry | Pete Lien & Sons, Inc. | Temporary Cessation NoticeNULL | NULL | TC | 4 | 11/12/2021 | NULL | NULL | NULL | NULL | NULL | ||
M1984014 | C-JD-8 | Highbury Resources Inc. | NULL | NULL | TC | 3 | 4/1/2019 | NULL | NULL | NULL | NULL | NULL | ||
M2021058 | Arkansas Valley Slag (AVS) | CJK Milling Company, LLC | Request for Technical RevisionNULL | NULL | TR | 1 | 4/11/2022 | NULL | NULL | NULL | NULL | NULL | ||
M2003092 | Gray Pit #1 | Nick H. Gray | Transfer from Nick H Gray to Lewis Energy Lands, LLCNULL | NULL | SO | 1 | 3/7/2022 | NULL | NULL | NULL | NULL | NULL | ||
M2006084 | White River City Pit | Oldcastle SW Group, Inc. dba United Companies | Technical RevisonNULL | NULL | TR | 1 | 7/29/2022 | NULL | NULL | NULL | NULL | NULL | ||
M2008083 | Black Cloud Mine | Resurrection Mining Company | Complaint from Brian Werderman - downstream property owner: Blown out beaver dams, sedimentationNULL | NULL | CT | 1 | 7/8/2019 | NULL | NULL | NULL | NULL | NULL | ||
M2017014 | Cottonwood Pass Pit | Oldcastle SW Group, Inc. dba United Companies | NULL | NULL | SL | 1 | 6/27/2022 | 6/27/2022 | NULL | 8/26/2022 | NULL | NULL | ||
M2017025 | Cottonwood Pass Pit | Oldcastle Southwest Group, Inc. dba United Companies | NULL | NULL | SL | 1 | 6/27/2022 | 6/27/2022 | NULL | 8/26/2022 | NULL | NULL | ||
M1987026 | Black Obsidian | Colorado Quarries Inc | Convert to 112c Permit by adding 136.67ac for a total permit area of 145.67acNULL | Application to convert from a 110c to a 112c construction materials permit by adding 136.67ac for a total permit area of 145.67ac.NULL | CN | 1 | 7/19/2021 | 8/2/2021 | NULL | 11/1/2021 | 8/2/2022 | NULL | ||
M1974004 | Specification Aggregates Quarry | Martin Marietta Materials, Inc. | AM04 to add 64.13 ac to south side of currently permitted areaNULL | This amendment is for the addition of 64.13 acres on the south boundary of the existing permit as shown on submitted mapsNULL | AM | 4 | 4/20/2022 | 4/26/2022 | 6/15/2022 | 7/25/2022 | 8/25/2022 | NULL | ||
M1977151 | Greeley Pit | R M Hiner Construction Co Inc | Placement of backfill to eliminate excess GW exposureNULL | Revision to clarify amount of backfill required and where on-site it will be placed to eliminate the excess groundwater exposure at the site for final reclamation.NULL | TR | 3 | 8/8/2022 | 8/8/2022 | NULL | 9/7/2022 | NULL | NULL | ||
M1991080 | Van Egmond Stone Pit | Russell Van Egmond | Conversion CN-1NULL | NULL | CN | 1 | 3/23/2022 | NULL | NULL | NULL | NULL | NULL | ||
M1982044 | Glen Johnston Site 1 | Jerry Johnston | Transfer from Jerry Johnston to Craig PesterNULL | NULL | SO | 3 | 8/9/2022 | NULL | NULL | NULL | NULL | NULL | ||
M1980244 | Cresson Project | Cripple Creek & Victor Gold Mining Company | Acreage Release Request - 4.3 AcresNULL | NULL | AR | 5 | 8/16/2021 | NULL | NULL | NULL | NULL | NULL | ||
M1980244 | Cresson Project | Cripple Creek & Victor Gold Mining Company | Closure stormwater design updatesNULL | Newmont Corporation’s Cripple Creek and Victor Gold Mining Company (CC&V) hereby provides Technical Revision (TR) 131 documenting updated closure stormwater designs; as committed to during the second and third adequacy reviews of the CC&V Amendment 13 (AM-13).NULL | TR | 131 | 3/24/2022 | 3/24/2022 | NULL | 4/25/2022 | 8/23/2022 | NULL | ||
M2018007 | Project P.J. | Taylor Conway | The construction of a new 3,435’ access road and Acreage Reduction AR1 to remove Mining Area #3 to offset the acreage of the road.NULL | Amendment Description: The construction of a new 3,435’ access road and Acreage Reduction AR1 to remove Mining Area #3 to offset the acreage of the road.NULL | AM | 1 | 8/17/2021 | 12/2/2021 | NULL | 1/3/2022 | 5/31/2022 | NULL | ||
M2018007 | Project P.J. | Taylor Conway | Acreage Reduction to remove Mining Area #3 to account for the acreage of the AM1 access road.NULL | Acreage Reduction Description: Removal of Mining Area #3 to account for the acreage of the AM1 access road. Please note, no mining activities have occurred in Mining Area #3 under M-2018-007.NULL | AR | 1 | 11/15/2021 | 12/2/2021 | NULL | 1/31/2022 | 5/31/2022 | NULL | ||
M2013040 | Godsend Claim- CMC 252626 | Richard Fretterd | Request for Full/Final ReleaseNULL | Request for Full/Final ReleaseNULL | SL | 2 | 7/25/2022 | 7/27/2022 | NULL | 9/26/2022 | NULL | NULL | ||
M2019055 | D Family Jewels | James and Yvette Downing | Request for Full/Final ReleaseNULL | Request for Full/Final ReleaseNULL | SL | 1 | 7/18/2022 | 7/27/2022 | NULL | 9/26/2022 | NULL | NULL | ||
M2019050 | Robert Michael #1-A | Robert and Lauren Berry | Surety ReleaseNULL | Full/Final Release of Entire Permitted AreaNULL | SL | 1 | 6/27/2022 | 7/6/2022 | NULL | 9/5/2022 | NULL | NULL | ||
C2010089 | New Horizon North Mine | Elk Ridge Mining and Reclamation, LLC | MR-32 Certificate of Liability InsuranceNULL | MR-32 provides an updated certificate of liability insurance for Elk Ridge Mining and Reclamation, LLC.NULL | MR | 32 | 8/2/2022 | 8/2/2022 | NULL | 8/12/2022 | NULL | NULL | ||
C2010089 | New Horizon North Mine | Elk Ridge Mining and Reclamation, LLC | Partial Phase II and Phase III Bond ReleaseNULL | Elk Ridge Mining and Reclamation is requesting Phase II bond release on 118.6 acres of irrigated pasture and dryland pasture, and Phase III bond release on 3.7 acres of a reclaimed sediment control structure.NULL | SL | 3 | 1/20/2022 | 2/17/2022 | NULL | 4/24/2022 | NULL | NULL | ||
C1981035 | King Coal Mine | GCC Energy, LLC | Permit Renewal No. 8NULL | GCC Energy, LLC has applied for a permit renewal of the King I & II Mine.NULL | RN | 8 | 2/18/2022 | 2/28/2022 | NULL | 6/28/2022 | 8/26/2022 | NULL | ||
C1981008 | New Horizon Mine | Elk Ridge Mining and Reclamation, LLC | MR-122 Certificate of InsuranceNULL | MR-122 provides a new certificate of insurance for Elk Ridge Mining and Reclamation, LLC.NULL | MR | 122 | 8/2/2022 | 8/2/2022 | NULL | 8/12/2022 | NULL | NULL | ||
C1981008 | New Horizon Mine | Elk Ridge Mining and Reclamation, LLC | PR-09 Prime Farmland RelocationNULL | PR-09 proposes to relocate 4 acres of Prime Farmland reclamation to a location with greater accessibility to agricultural managementNULL | PR | 9 | 4/21/2022 | 4/29/2022 | 6/4/2022 | 8/27/2022 | NULL | NULL | ||
C1981008 | New Horizon Mine | Elk Ridge Mining and Reclamation, LLC | Phase I, II & III Bond ReleaseNULL | The permittee is requesting Phase I, II and III bond release for nine (9) plugged and abandoned monitoring wells, and two (2) plugged and abandoned backfill wells. The permittee is requesting Phase I release on 24.5 acres that have been backfilled and graded. The permittee is requesting Phase II release on 11.4 acres of dryland pasture and irrigated pasture reclaimed areas.NULL | SL | 25 | 5/16/2022 | 7/5/2022 | 7/16/2022 | NULL | NULL | NULL | ||
C1981012 | New Elk Mine | New Elk Coal Company, LLC | Surety IncreaseNULL | The Division proposes a requried surety increase for the New Elk Mine (C-1981-012). This increase in required surety is a result of the Division's review and update of the reclamation cost estimate for the site. NULL | SI | 4 | 8/2/2022 | NULL | NULL | NULL | NULL | NULL | ||
M2008076 | Robinson Sons Gravel Pit No. 1 | Robinson Sons Inc | David Vigil complaint regarding inadequate structure agreement. NULL | NULL | CT | 2 | 2/13/2019 | NULL | NULL | NULL | NULL | NULL | ||
M2003002 | Ghost River Gravel Pit | HCR High Country Repair | Surety incrrease to cover the cost of reclamation at the site.NULL | NULL | SI | 2 | 8/26/2021 | 8/26/2021 | NULL | 10/25/2021 | 1/15/2022 | NULL | ||
M1977560 | Rocky Ford East Pit | Valco, LLC | Full and final release request of permitted area.NULL | Full and final release request of permitted area.NULL | SL | 1 | 6/27/2022 | 6/30/2022 | NULL | 8/29/2022 | NULL | NULL | ||
M1977208 | Lyons Quarry | CEMEX, Inc. | Description of CKD Material Handling Plan and associated dust control measures.NULL | Description of CKD Material Handling Plan and associated dust control measures.NULL | TR | 17 | 6/30/2022 | 6/30/2022 | NULL | 8/1/2022 | 8/31/2022 | NULL | ||
M1981075 | Phillips Stone Company | Blue Mountain Stone, Inc. | Conversion No.1NULL | NULL | CN | 1 | 6/22/2022 | NULL | NULL | NULL | NULL | NULL | ||
C1981022 | Elk Creek Mine | Oxbow Mining, LLC | Partial Phase II Bond Release ApplicationNULL | SL-6 seeks Phase II Bond Release on 35.63 acres spread over three parcels; the Elk Creek Corridor, the West Valley Fill and the II West Valley Fill. Reclamation work on the SL-6 parcels was completed between 2002 and 2018. NULL | SL | 6 | 10/27/2021 | 11/29/2021 | 12/24/2021 | NULL | NULL | NULL | ||
C1981022 | Elk Creek Mine | Oxbow Mining, LLC | Partial Phase III Bond Release ApplicationNULL | SL-7 seeks Phase III Bond Release on 21.24 acres of reclaimed drill pads and roads. Reclamation of the SL-7 parcels was completed during 2011. NULL | SL | 7 | 4/26/2022 | 4/27/2022 | 4/29/2022 | 9/10/2022 | NULL | NULL | ||
C1980007 | West Elk Mine | Mountain Coal Company, LLC | Partial Phase I Bond ReleaseNULL | Surety Release No. 15 seeks Phase I Bond Release for the plugging and abandonment of 9 Mine Ventilation Boreholes (MVBs) and the backfilling and regrading of associated pads and roads in the Dry Fork of Minnesota Creek area, comprising a total of approximately 7.65 acres.NULL | SL | 15 | 1/26/2022 | 4/8/2022 | 3/25/2022 | 9/12/2022 | NULL | NULL | ||
C1980007 | West Elk Mine | Mountain Coal Company, LLC | Construction of 81 B-Seam Mine Ventilation Boreholes, Pads and RoadsNULL | TR-147 seeks to allow for the construction of 81 Mine Ventilation Boreholes (MVBs), together with associated drill pads and access roads, above future B-seam longwall panels LWB26 through LWB29 in order to ventilate combustible gases such as methane. Each MVB is proposed to be located on a pad of approximately half an acre, with the exception of the two easternmost pads on each panel which will be co-located on pads of approximately one acre. Approximately 10 miles of new road are proposed to be constructed, with another mile of existing trail to be widened to a road.NULL | TR | 147 | 4/26/2019 | 5/1/2019 | 5/18/2019 | 6/30/2019 | 10/31/2022 | NULL | ||
C1980007 | West Elk Mine | Mountain Coal Company, LLC | Revision to layout of E-seam panelsNULL | TR-150 seeks to revise the layout of E-seam panels, replacing previously permitted panel LWE9 with three smaller panels, LWE15, LWE16 and LWE17NULL | TR | 150 | 12/31/2021 | 1/10/2022 | 1/29/2022 | 3/11/2022 | 9/30/2022 | NULL | ||
M1979010 | Avery Construction Pit | ACA Products, Inc. | Amendment to Increase the Mine AcreageNULL | Amendment to increase the Mine Acreage by 107.1 acres for a proposed new permit area of 238.46 AcresNULL | AM | 3 | 5/17/2022 | 5/23/2022 | NULL | 8/22/2022 | NULL | NULL | ||
M2004045 | Hanna Pit No. 1 | Rio Grande Ranch, LLC | Board Ordered Surety Forfeiture, 3/18/2022NULL | NULL | SF | 1 | 4/13/2022 | 4/13/2022 | NULL | NULL | NULL | NULL | ||
M2012032 | Revenue Mine | Ouray Silver Mines Inc. | Expansion to Accommodate Refuge Chamber and Secondary EscapewayNULL | The scope of Amendment 2 is limited to expanding the affected lands boundary in Governor Basin to accommodate disturbance associated with contruction of a refuge chamber and secondary escapeway.NULL | AM | 2 | 12/3/2021 | 12/13/2021 | 1/27/2022 | 3/14/2022 | 9/1/2022 | NULL | ||
M2020008 | Rifle Gravel Pit #1 | Scott Contracting, Inc. | NULL | NULL | AM | 1 | 2/3/2021 | NULL | NULL | NULL | NULL | NULL | ||
M2021035 | Smith Pit | Yuma County | Operator is storing fuel on site, stockpiles are not in the approved location, topsoil is not seeded to control erosion.NULL | Complaint alleges that the mine operators are not following the mining plan or the reclamation plan, storing 1000 gallons of fuel on site with no containment. Mine plan states no on-site fuel storage in permitted area.NULL | CT | 1 | 8/8/2022 | NULL | NULL | NULL | NULL | NULL | ||
M2021024 | Achieve More Agricultural Complex Site | New Vision Investments, LLC | Surety ReleaseNULL | NULL | SL | 1 | 6/15/2022 | 6/15/2022 | NULL | 8/15/2022 | NULL | NULL | ||
M2009086 | Pickering Family Pit | Flintstone Gravel Pit Inc. | Amendment application to add 16.84 acres to the existing 19.90 acre site for a total permit area of 36.74 acres.NULL | Amendment application to add 16.84 acres to the existing 19.90 acre site for a total permit area of 36.74 acres.NULL | AM | 1 | 4/21/2022 | 6/9/2022 | NULL | 9/7/2022 | NULL | NULL | ||
M2001068 | Bottomless Pit | Tamrock Gravel LLC | Full/Final Release RequestNULL | Full/Final Release RequestNULL | SL | 1 | 6/28/2022 | 6/28/2022 | NULL | 8/29/2022 | NULL | NULL | ||
M1978051 | Gaede Pit | Lincoln County | Acreage ReductionNULL | Request to remove one acre from the permit area that has not been affected. NULL | AR | 1 | 7/8/2022 | 7/28/2022 | NULL | 9/26/2022 | NULL | NULL | ||
M1985105 | Harold Eichman Gravel Pit | Lincoln County | Conversion No.1NULL | NULL | CN | 1 | 6/28/2022 | 7/11/2022 | NULL | 10/10/2022 | NULL | NULL | ||
C1981010 | Trapper Mine | Trapper Mining, Inc. | RN-08 Permit RenewalNULL | Trapper Mine Permit Renewal RN-08 application for the upcoming five-year permit term, 2023-2027.NULL | RN | 8 | 6/30/2022 | 7/2/2022 | NULL | 10/30/2022 | NULL | NULL | ||
C1981028 | Keenesburg Strip Mine | Coors Energy Company | Phase I Bond ReleaseNULL | This application requests Phase I release of a large portion of the remaining permit area. NULL | SL | 11 | 6/21/2022 | 8/4/2022 | 8/13/2022 | NULL | NULL | NULL | ||
C1981038 | Bowie No. 1 Mine | Bowie Resources, LLC | Request for Phase III at the West MineNULL | SL-08 will release approximately 13.1 acres from the West Mine of the Bowie No. 1 Mine permit.NULL | SL | 8 | 5/24/2022 | 6/23/2022 | 6/10/2022 | NULL | NULL | NULL | ||
C1996083 | Bowie No. 2 Mine | Bowie Resources, LLC | Permit Renewal No. 5NULL | The operator has applied to renew permit C-1996-083 for another five-year term.NULL | RN | 5 | 9/23/2021 | 9/27/2021 | 1/21/2022 | 1/25/2022 | 11/18/2022 | NULL | ||
M1985112 | Loloff Mine | Loloff Construction, Inc. | Full/Final ReleaseNULL | This application is for release of the entire permitted area and a reduction of the required bond amount to $0.00.NULL | SL | 2 | 6/28/2022 | 6/29/2022 | NULL | 8/29/2022 | NULL | NULL | ||
M1983209 | Benton Dawson Gravel | Frank Gilmore | Update of Drainage in Reclamation PlanNULL | This technical revision updates the Reclamation Plan to match the current grading and surface waer management within the pit floor. NULL | TR | 3 | 7/26/2022 | 7/26/2022 | NULL | 8/25/2022 | NULL | NULL | ||
M1998105 | Delta Paving Gravel Pit | Grand Junction Pipe & Supply Co. | Addition of 63.4 Acres to the Permit, Revision of Mining and Reclamation PlansNULL | This amendment proposes the addition of 63.4 acres to the permit area and revises the mining and reclamation plans.NULL | AM | 1 | 5/6/2022 | 6/6/2022 | NULL | 9/5/2022 | NULL | NULL | ||
M2000158 | S & H Mine | Scout Investments, L.L.C. | Complaint Regarding Well Impacts and Other ItemsNULL | A complaint was received by the Division from an adjacent landowner regarding potential impacts on his well, as well as several other issues.NULL | CT | 1 | 4/6/2022 | NULL | NULL | NULL | NULL | NULL | ||
M1995060 | Butcher Pit | Southway Construction Company, Inc. | NULL | NULL | TC | 2 | 6/13/2019 | NULL | NULL | NULL | NULL | NULL | ||
M1987013 | Burton Pit | Southway Construction Company, Inc. | NULL | increase FW to 52,786.00NULL | SI | 2 | 3/9/2020 | 3/9/2020 | NULL | 5/8/2020 | NULL | NULL | ||
M2019054 | Skull Creek | Uinta Mining, LLC | NULL | NULL | AM | 1 | 12/30/2019 | 1/15/2020 | NULL | 4/14/2020 | 8/1/2020 | NULL | ||
M2020023 | Langston Borrow Pit | Langston Concrete, Inc. | Mining without a permitNULL | NULL | CT | 1 | 4/22/2020 | 4/24/2020 | NULL | NULL | NULL | NULL | ||
M2020028 | Big Johnson Reservoir | Fountain Mutual Irrigation Company | The excavation site is 5550 Goldfield Rd. Colorado Springs, 80911, and the material is being transported for site improvements to 3700 Drennan Rd. Colorado Springs, 80910NULL | They have started the project we spoke about last week and have a fleet of trucks hauling. As you can see, this is a substantial amount and it's also apparent they have been doing this before if you see how far back to the right hand side of the photo the excavation goes. Please address as soon as possible. The excavation site is 5550 Goldfield Rd. Colorado Springs, 80911, and the material is being transported for site improvements to 3700 Drennan Rd. Colorado Springs, 80910 NULL | CT | 1 | 5/6/2020 | 5/6/2020 | NULL | NULL | NULL | NULL | ||
M2019021 | Buss Barrow Pit | Fremont Paving & Redi-Mix, Inc. | Full/Final Release of Entire Permitted AreaNULL | NULL | SL | 1 | 7/25/2022 | 7/26/2022 | NULL | 9/26/2022 | NULL | NULL | ||
M1982155 | Fountain Pit | Schmidt Construction Company | Update and Modernize the 36 Year old permitNULL | NULL | TR | 3 | 7/1/2022 | 7/5/2022 | NULL | 8/4/2022 | 9/18/2022 | NULL | ||
M1981044 | Solberg Pit | Solberg Gravel LLC | Solberg Pit Amendment-03NULL | Solberg Gravel LLC is submitting an amendment to the amendment application that will relocate the east affected area boundary to align with the permit boundaryNULL | AM | 3 | 11/17/2021 | 5/2/2022 | NULL | 8/1/2022 | 8/19/2022 | NULL | ||
M1980244 | Cresson Project | Cripple Creek & Victor Gold Mining Company | Stormwater control improvements in the vicinity of the High Grade MillNULL | Stormwater control improvements in the vicinity of the High Grade MillNULL | TR | 130 | 1/20/2022 | 1/20/2022 | NULL | 2/21/2022 | 8/19/2022 | NULL | ||
M1997064 | Salt Canyon Project | GCC Rio Grande, Inc. | Updated Mining Plan and Disturbed Acreage IncreaseNULL | NULL | TR | 3 | 5/27/2022 | 5/31/2022 | NULL | 6/30/2022 | 8/12/2022 | NULL | ||
M2002096 | Ranch Land Rock Pit #1 | Holcim (US) Inc. | Notice of Temporary CessationNULL | NULL | TC | 3 | 6/3/2022 | 6/6/2022 | NULL | 7/6/2022 | 8/17/2022 | NULL | ||
M1977168 | Marrs Memorials | Colorado Quarries Inc | BLM 3-year review increaseNULL | NULL | SI | 2 | 11/26/2019 | 11/26/2019 | NULL | 1/27/2020 | NULL | NULL | ||
M1977210 | Snyder Quarry | City of Colorado Springs | Noticed this morning and continuing into this afternoon that there is an EXTREME amount of trucks carrying aggregate out of the Snyder Quarry. In 19 minutes I videoed 12 loaded trucks departing the quarry.NULL | NULL | CT | 1 | 4/22/2020 | 4/22/2020 | NULL | NULL | NULL | NULL | ||
M1977211 | Pikeview Quarry | Continental Materials Corporation | Castle Concrete, the owner /operator, has an agreement with the City of Colorado Springs to quarry 9.3 acres north of the existing Mining Permit area and the adjacent “affected area”NULL | I would like to follow up on additional, new mining which has been proposed for the Pikeview Quarry. Castle Concrete, the owner /operator, has an agreement with the City of Colorado Springs to quarry 9.3 acres north of the existing Mining Permit area and the adjacent “affected area”. For your reference, I have attached a copy of the agreement, which permits / anticipates the mining of 2,200,000 cubic yards of material from that 9.3 acre site. This property appears to be outside the currently permitted area with the parties’ description of the work is described below: “work that will lower the elevation of a ridge and require reseeding in the area.” “The excavation of 2.2M cubic yards of material from land to the north of the quarry is expected to change the topography of a double ridge line.” I recall from submissions for AM-04, the quarry owner clearly stated the quarry reclamation could be done without “a single cubic yard” of dirt from the property the City purchased. Is a permit needed for this expansion and change to the reclamation plans?NULL | CT | 1 | 2/18/2022 | 2/18/2022 | NULL | NULL | NULL | NULL | ||
M1977211 | Pikeview Quarry | Continental Materials Corporation | Increase compacted lift thickness to 24" maximum for site reclamation.NULL | Increase compacted lift thickness from 12" maximum to 24" maximum for site reclamation.NULL | TR | 21 | 8/2/2022 | 8/2/2022 | NULL | 9/1/2022 | NULL | NULL | ||
M1978009 | Apache 9 | General Shale Brick, Inc. | Surety ReductionNULL | NULL | SR | 1 | 6/28/2022 | NULL | NULL | NULL | NULL | NULL | ||
C1984065 | Coal Ridge No. 1 Mine | C.B. Minerals Company, LLC | Midterm Review Findings Dated April 2, 2019NULL | NULL | MT | 8 | 4/2/2019 | NULL | NULL | NULL | NULL | NULL | ||
C1981012 | New Elk Mine | New Elk Coal Company, LLC | Proposed new haul road. NULL | This revision (TR76) proposes to change a currently approved light use road to a haul road and extends the haul road for a total length of about 2.7 miles. This permit boundary extension represents 11.3 acres and the proposed additional affected area was historically disturbed in the former railroad bed (including side slopes, culverts, and access trails). The disturbed area is the running surface of the new road (along with berms or other areas of disturbance associated with construction of the road) that represents 6.4 acres (see proposed Map 1 and Map 15a). NULL | TR | 76 | 10/26/2021 | 6/21/2022 | NULL | 8/20/2022 | NULL | NULL | ||
C1981019 | Colowyo Coal Mine | Colowyo Coal Company L.P. | Midterm Review Findings Dated May 5,2020NULL | NULL | MT | 8 | 5/5/2020 | NULL | NULL | NULL | NULL | NULL | ||
C1981019 | Colowyo Coal Mine | Colowyo Coal Company L.P. | Permit Renewal No 8NULL | Colowyo Mine Permit Renewal No. 8. NULL | RN | 8 | 4/18/2022 | 4/26/2022 | 7/5/2022 | 8/24/2022 | NULL | NULL | ||
M1981276 | Hertzog Pit | Bower Brothers Construction, Inc. | Amendment 1NULL | AM1 proposes to incorporate two seperate pits into one permit which will increase the permit boundry by 161 acres to a total of 241 acres.NULL | AM | 1 | 3/28/2022 | 6/1/2022 | NULL | 8/30/2022 | NULL | NULL |